Skip to content
Open Monday to Saturday
en
EstimateGet an estimate
Ridgeway House at dusk: a two-storey house with a timber-lined upper floor, lit from inside

Residential New build · [Your city]

Ridgeway House

Floor area
320 m²
Programme
46 weeks
Structure
Timber frame
Contract
Fixed price
Completed
May 2026

The brief

A four-bedroom house on a sloping plot, built around a single oak-framed room that the clients had already fallen for.

The site drops three metres from the road to the garden, so the house steps with it: garage and entrance at street level, living rooms half a level down and opening onto the terrace, bedrooms above. The architect wanted the upper floor read as a timber box sitting on a rendered base, which is what you see from the lane.

What we did

Groundworks in a wet February, a retaining wall along the whole north boundary, then a closed-panel timber frame erected in eight working days. The oak frame for the main room was cut off site and craned in with the roof trusses. We ran the fit-out in two halves so the family could move into the lower floor six weeks before the end.

The result

Handed over on the programme week we set in the contract. Two variations, both client-led, both priced before the work started. The airtightness test came in well under the target on the first attempt.

Job sheet

FW-0412
Client
Private
Architect
[Practice name]
Engineer
[Practice name]
Site manager
[Name]
Variations
2, client-led

Services on this job

  • Groundworks
  • Retaining wall
  • Timber frame
  • Oak frame
  • Full fit-out

Programme

  1. Ground
  2. Frame
  3. Envelope
  4. Fit-out
  5. Handover

Jun 2025 – May 2026 · 46 weeks, on the contract week.

Site photos

  • The roof trusses of the timber frame on a clear day, week nine
    Week 09 · Frame
  • Two carpenters lifting a wall panel into place from the scaffold
    Week 07 · Frame
  • Tied reinforcement across the slab before the pour
    Week 04 · Groundworks
  • The finished kitchen in pale timber looking out to the terrace
    Week 40 · Fit-out
  • The finished house from the garden at dusk
    Week 46 · Handover