07 — Questions
Before you break ground.
What people ask before they build, answered plainly. If yours is not here, ask us.
Pricing
What does the budget range cover?
Everything from the slab to the decoration: groundworks, structure, roof, windows, services, kitchens, bathrooms and finishes, with our management and insurance. It leaves out the land, the design fees, planning and building-control charges, and furniture.
How does the range become a fixed price?
We visit the site, read your drawings and the engineer’s design, and price every item. You get a written sum and a programme. The sum is fixed when you sign; anything that changes it afterwards is priced and agreed before the work starts.
What if I don’t have drawings yet?
Come anyway. We can price from a sketch and a conversation to the same range the estimator gives, and we can introduce you to architects and engineers we have built with. A fixed price needs drawings, so that comes once you have them.
Do you charge for the site visit?
No. The visit and the written budget are free. We ask only that you tell us if you decide to go with someone else, so we can plan the yard.
On site
Who will I deal with?
One site manager, from the first visit to the keys. They price the job, run it and answer the phone. You will meet them before you sign.
Can I visit the site while you build?
Any day the site is open, with a call first so your manager can walk you round safely. The Friday report has photographs for the days you can’t.
What happens if I change my mind about something?
Tell your manager. Small things are often free; anything that changes the price or the programme is written up as a variation, priced, and agreed with you before the work starts. The decision list in the Friday report shows what is still open.
How do you handle bad weather?
The programme has float in it for the weeks that are usually wet. If the weather takes more than the float, we tell you in the Friday report and show you the new end date, not a surprise at the end.
After handover
What happens at handover?
A walk round with your manager, a snagging list you both sign, the certificates, the manuals for everything with a switch, and the keys. We come back at four weeks for the first items on the list.
How long is the defects period?
The contract sets it, and the stages on the company page say how long ours usually is. During it we fix anything that is our work at no charge, and we visit once more before it ends.
Can you come back for more work later?
Yes, and it is easier the second time: we have the drawings, the photographs of what is behind every wall, and the people who built it.
Still wondering?
Ask the person who’ll build it.
A site manager answers every message.