04 — Process
Five phases. You’ll know which one you’re in.
Every programme we send uses the same five phases, so you always know where the job is, what is happening on site and what we need from you next.
04.1 — Pick a phase
Where the job is, week by week.
The programme we send you uses the same five phases. Pick one to see what happens on site and what you’ll be asked for.
- What happens
- Strip out, excavate, drainage, then the foundations and the slab. The engineer signs off the steel before any concrete arrives.
- Who’s on site
- Our groundworks gang, the engineer at two inspections, building control.
- You’ll be asked for
- Confirmation of the party-wall notices and where we can put the site cabin.
- What happens
- The frame goes up: timber or blockwork walls, floors, then the roof structure. This is the week the building appears.
- Who’s on site
- Carpenters and bricklayers, the crane for one day, the frame supplier.
- You’ll be asked for
- Final window and door sizes. After this week they are expensive to change.
- What happens
- Roof covering, external walls, windows and doors. The building is watertight by the end of this phase and first fix starts inside.
- Who’s on site
- Roofers, bricklayers, the glazing team, electricians and plumbers for first fix.
- You’ll be asked for
- Brick, cladding and roof samples signed off on site.
- What happens
- Plaster, second fix, kitchens, bathrooms, floors and decoration. The longest phase and the one with the most decisions.
- Who’s on site
- Plasterers, joiners, tilers, decorators, the kitchen fitter.
- You’ll be asked for
- Tiles, sanitaryware, ironmongery and paint colours, each on a dated decision list.
- What happens
- Testing, certificates, a snagging walk with you, then the keys. We come back at four weeks and before the end of the defects period.
- Who’s on site
- The site manager, the electrician and plumber for commissioning, building control for the completion certificate.
- You’ll be asked for
- A morning for the handover walk and your signature on the completion certificate.
04.2 — Each phase in full
What happens, and what we need from you.
The weeks are typical for a house of around three hundred square metres. Your programme will have its own, on the first page of your contract.
-
Groundworks
Weeks 1–6 wks
- What happens
- Strip out, excavate, drainage, then the foundations and the slab. The engineer signs off the steel before any concrete arrives.
- Who’s on site
- Our groundworks gang, the engineer at two inspections, building control.
- You’ll be asked for
- Confirmation of the party-wall notices and where we can put the site cabin.
-
Frame
Weeks 6–14 wks
- What happens
- The frame goes up: timber or blockwork walls, floors, then the roof structure. This is the week the building appears.
- Who’s on site
- Carpenters and bricklayers, the crane for one day, the frame supplier.
- You’ll be asked for
- Final window and door sizes. After this week they are expensive to change.
-
Envelope
Weeks 14–24 wks
- What happens
- Roof covering, external walls, windows and doors. The building is watertight by the end of this phase and first fix starts inside.
- Who’s on site
- Roofers, bricklayers, the glazing team, electricians and plumbers for first fix.
- You’ll be asked for
- Brick, cladding and roof samples signed off on site.
-
Fit-out
Weeks 24–42 wks
- What happens
- Plaster, second fix, kitchens, bathrooms, floors and decoration. The longest phase and the one with the most decisions.
- Who’s on site
- Plasterers, joiners, tilers, decorators, the kitchen fitter.
- You’ll be asked for
- Tiles, sanitaryware, ironmongery and paint colours, each on a dated decision list.
-
Handover
Weeks 42–46 wks
- What happens
- Testing, certificates, a snagging walk with you, then the keys. We come back at four weeks and before the end of the defects period.
- Who’s on site
- The site manager, the electrician and plumber for commissioning, building control for the completion certificate.
- You’ll be asked for
- A morning for the handover walk and your signature on the completion certificate.
04.3 — How a job runs
One sheet, start to finish.
Whatever you build, the job goes through the same three stages in the same order. The programme decides how long each one takes.
- 2–4 wks
Pre-construction
We price from your drawings, visit the site, and give you a fixed sum and a programme. If the two don’t meet your budget we say so before you commit.
- By programme
On site
One site manager, a Friday photo report, and a decision list so nothing waits on you without you knowing.
- 12 months
After handover
A snagging visit at four weeks and another before the end of the defects period. The same manager answers the phone.
On site
Who will I deal with?
Can I visit the site while you build?
What happens if I change my mind about something?
How do you handle bad weather?