Five phases. You’ll know which one you’re in.

Every programme we send uses the same five phases, so you always know where the job is, what is happening on site and what we need from you next.

04.1 — Pick a phase

Where the job is, week by week.

The programme we send you uses the same five phases. Pick one to see what happens on site and what you’ll be asked for.

The timber roof frame of a new house going up against a blue sky
What happens
The frame goes up: timber or blockwork walls, floors, then the roof structure. This is the week the building appears.
Who’s on site
Carpenters and bricklayers, the crane for one day, the frame supplier.
You’ll be asked for
Final window and door sizes. After this week they are expensive to change.

04.2 — Each phase in full

What happens, and what we need from you.

The weeks are typical for a house of around three hundred square metres. Your programme will have its own, on the first page of your contract.

  1. Groundworks

    Weeks 1–6 wks

    What happens
    Strip out, excavate, drainage, then the foundations and the slab. The engineer signs off the steel before any concrete arrives.
    Who’s on site
    Our groundworks gang, the engineer at two inspections, building control.
    You’ll be asked for
    Confirmation of the party-wall notices and where we can put the site cabin.
  2. Frame

    Weeks 6–14 wks

    What happens
    The frame goes up: timber or blockwork walls, floors, then the roof structure. This is the week the building appears.
    Who’s on site
    Carpenters and bricklayers, the crane for one day, the frame supplier.
    You’ll be asked for
    Final window and door sizes. After this week they are expensive to change.
  3. Envelope

    Weeks 14–24 wks

    What happens
    Roof covering, external walls, windows and doors. The building is watertight by the end of this phase and first fix starts inside.
    Who’s on site
    Roofers, bricklayers, the glazing team, electricians and plumbers for first fix.
    You’ll be asked for
    Brick, cladding and roof samples signed off on site.
  4. Fit-out

    Weeks 24–42 wks

    What happens
    Plaster, second fix, kitchens, bathrooms, floors and decoration. The longest phase and the one with the most decisions.
    Who’s on site
    Plasterers, joiners, tilers, decorators, the kitchen fitter.
    You’ll be asked for
    Tiles, sanitaryware, ironmongery and paint colours, each on a dated decision list.
  5. Handover

    Weeks 42–46 wks

    What happens
    Testing, certificates, a snagging walk with you, then the keys. We come back at four weeks and before the end of the defects period.
    Who’s on site
    The site manager, the electrician and plumber for commissioning, building control for the completion certificate.
    You’ll be asked for
    A morning for the handover walk and your signature on the completion certificate.

04.3 — How a job runs

One sheet, start to finish.

Whatever you build, the job goes through the same three stages in the same order. The programme decides how long each one takes.

  1. Pre-construction

    We price from your drawings, visit the site, and give you a fixed sum and a programme. If the two don’t meet your budget we say so before you commit.

    2–4 wks
  2. On site

    One site manager, a Friday photo report, and a decision list so nothing waits on you without you knowing.

    By programme
  3. After handover

    A snagging visit at four weeks and another before the end of the defects period. The same manager answers the phone.

    12 months

On site

Who will I deal with?
One site manager, from the first visit to the keys. They price the job, run it and answer the phone. You will meet them before you sign.
Can I visit the site while you build?
Any day the site is open, with a call first so your manager can walk you round safely. The Friday report has photographs for the days you can’t.
What happens if I change my mind about something?
Tell your manager. Small things are often free; anything that changes the price or the programme is written up as a variation, priced, and agreed with you before the work starts. The decision list in the Friday report shows what is still open.
How do you handle bad weather?
The programme has float in it for the weeks that are usually wet. If the weather takes more than the float, we tell you in the Friday report and show you the new end date, not a surprise at the end.