Civils Reinforced concrete · [Your city]

Mill Lane culvert

Programme
14 weeks
Structure
Highways
Contract
Measured
Completed
Jun 2025

The brief

A Victorian brick arch carried the lane over a stream and backed up every winter.

The highways authority wanted it replaced with a precast box culvert and a new deck, under a twelve-week closure that could not slip because the diversion ran past a school.

What we did

We diverted the stream through a temporary flume, broke out the arch in three days and poured the base slab on week three. The culvert units were set in a morning, then the wing walls, the deck and the parapets. The road was reopened for the school run on the Monday of week twelve; the last two weeks were landscaping and the stream bed.

The result

Reopened on the day in the closure notice. The flume stayed in longer than planned after a wet April, and that was the only change to the method.

Job sheet

FW-0360
Client
[Highways authority]
Architect
Not applicable
Engineer
[Practice name]
Site manager
[Name]
Variations
1, weather

Services on this job

  • Stream diversion
  • Demolition
  • Reinforced concrete
  • Precast culvert
  • Road deck and parapets
  • Landscaping

Programme

  1. Ground
  2. Frame
  3. Envelope
  4. Fit-out
  5. Handover

Feb 2025 – Jun 2025 · 14 weeks, on the contract week.