Steel portal frames and roof purlins of an industrial unit

Commercial Refurbishment · [Your city]

Chapel Street Workshops

Floor area
1,200 m²
Programme
26 weeks
Structure
Steel
Contract
Fixed price
Completed
Nov 2024

The brief

A 1960s engineering shed on a back street, empty for a decade, to be turned into eight small workshops for makers with a shared yard and loading bay.

The landlord wanted the crane rails and the sawtooth roof kept, both for the look and because the planners asked for it.

What we did

We stripped the building to its frame, replaced a third of the roof purlins and all of the glazing in the sawtooth, then built the units as blockwork boxes inside the shell with their own services. New steel went in only where the old frame had been cut about over the years.

The result

Seven of the eight units were let before we handed over. The last variation was the landlord's: a roller door on the yard side that the first tenant asked for.

Job sheet

FW-0334
Client
[Company name]
Architect
[Practice name]
Engineer
[Practice name]
Site manager
[Name]
Variations
3, client-led

Services on this job

  • Strip-out
  • Structural repairs
  • Roof and glazing
  • Blockwork units
  • Services
  • Yard

Programme

  1. Ground
  2. Frame
  3. Envelope
  4. Fit-out
  5. Handover

May 2024 – Nov 2024 · 26 weeks, on the contract week.

Site photos

  • Two steel fixers tying reinforcement for the new floor slab
    Week 05 · Frame
  • Carpenters lifting a panel into the first unit
    Week 09 · Envelope